Project Quality Management
SKILLSET
No description available
Related Questions
- Skillset Inc.'s Quality Department is verifying a new production line. The production line is set up for a pharmaceutical application in which cough syrup is dispensed equally and in the same overall volume required for every bottle. After several hrs of observation, 99% of the bottles are being filled to the same level, however, it is too low for commercial sales as it is only filling bottles at _s of the anticipated volume. Which of the methods below would be best for analyzing and correcting the problem leading to a stable process?
- Brainstorming is a Quality Planning Tool used to consolidate ideas by voting on the best for the project.
- When the result is rated on a continuous scale that measures the degree of conformity, it is called _______.
- Identifying quality standards relevant to the project and determining how to satisfy them is called _______.
- The total cost of all efforts to achieve product or service quality is called _______.
- A structured tool that verifies a set of required steps which must be performed is called _______.
- "The organizational structure, responsibilities, procedures, processes and resources needed to implement quality management" is called _______.
- Jeremiah has 4 projects, with the following conditions: Project 1 _ CPI=.8 & SPI =.9, Project 2- CPI=1.1 & SPI=.8, Project 3 _ CPI= 1.0 & SPI=1.0, and Project 4- CPI=.6 & SPI=1.2 Which of his projects does he need to ask for support to get back on track at this point in time?
- All of the following are examples of Basic Quality Tools except .
- Process metrics includes...